‹ BackNewsMainnet upgrade

Mainnet upgrade

Gemini switches Zcash node software ahead of NU7 block-time cut
Messari highlights Stable’s USDT-native L1 StableChain as mainnet moves to v1.8.0
Pi Network completes mainnet Protocol 27 upgrade, schedules Protocol 28 for Oct. 16
AVAX rises about 50% in a week as Helicon upgrade and RWA narrative draw attention
Avalanche sets Helicon mainnet upgrade for Sept. 22, requires node updates
Zcash sets Nov. 5 target for NU7 mainnet upgrade, with 25-second blocks planned
Solana cuts mainnet slot time to 250ms, speeding block production without raising total capacity
Jump Crypto to end Frankendancer support after Alpenglow goes live on Solana mainnet